Accurate Quantity Takeoffs That Save Your Team Hours

Quick answer: A construction takeoff is the process of measuring and counting every item on a set of construction drawings, such as square feet of drywall, linear feet of pipe, cubic yards of concrete and the number of doors or light fixtures. The result is a quantity list organized by trade and location that contractors use to price materials and labor, order supplies and compare subcontractor bids. Digital takeoffs also include marked-up drawings that show exactly what was measured.

Takeoff is the slowest part of estimating, and it is where most estimating errors start. A missed wall type, a wrong scale or a duplicated sheet can throw off an entire bid. Our takeoff specialists measure every sheet with digital tools, verify scales, track revisions and organize quantities so they are ready for pricing.

Many clients use our takeoffs to free up their in-house estimators, who can then focus on pricing, subcontractor coverage and bid strategy. Others need a complete package that includes pricing, which is available through our Construction Cost Estimating Services. If you need a supplier-ready list of materials with sizes and waste factors, choose our Material Takeoff Services.

We take off every trade, from Concrete Estimating Services and framing to MEP and finishes, for residential, commercial and industrial projects anywhere in Arizona.

What Your Construction Takeoff Includes

Get a Fixed Quote Today

Send your drawings and receive a fixed fee and delivery date, usually the same business day.

Scope of Work

Types of Construction Takeoffs We Provide

Whatever you need to measure, we can take it off and organize it the way your team prices work.

Area Takeoffs

Slabs, flooring, drywall, roofing, paint, stucco, insulation, paving and other square-foot quantities.

Linear Takeoffs

Walls, footings, curbs, piping, conduit, ductwork, trim, gutters and fencing measured in linear feet.

Volume Takeoffs

Excavation, fill, concrete and aggregate base measured in cubic yards, with swell and compaction noted.

Count Takeoffs

Doors, windows, fixtures, devices, light fixtures, diffusers, sprinkler heads and equipment counted by type.

Assembly Takeoffs

Wall, roof and floor assemblies broken into every component, such as studs, board, insulation and finish.

Multi-Trade Takeoffs

Complete takeoffs for all divisions on a project, organized for general contractor bids.

Single-Trade Takeoffs

One scope measured in depth for a subcontractor bid. See Subcontractor Estimating Services.

BIM Quantity Extraction

Quantities extracted from Revit and IFC models and checked against the drawings.

Site and Civil Takeoffs

Grading, utilities, paving and storm drainage from civil plans. See Sitework and Earthwork Estimating Services.

In Depth

How Our Digital Takeoff Process Works

We use industry-standard digital takeoff tools such as PlanSwift, Bluebeam Revu and On-Screen Takeoff. Software makes measurement faster, but accuracy still depends on process. This is ours:

Set up and scale verification

Every sheet is calibrated against a known dimension, not just the printed scale, because PDFs are often resized. Sheets are organized by discipline and revision.

Layered, color-coded measurement

Each item type gets its own layer and color. You can open the marked-up PDF and immediately see which walls, slabs or fixtures were counted, and which were not.

Breakdowns that match how you build

Quantities can be split by building, floor, unit type, phase or area. That makes it easier to schedule deliveries, assign crews and track cost.

Cross-checks

Architectural quantities are checked against structural and MEP sheets, schedules are compared with plan counts, and totals are tested against benchmarks for similar Arizona projects.

Revisions and addenda

When addenda or revised sheets arrive, we update only the affected quantities and show what changed, so you do not have to start over. Learn more in our Estimating Methodology.

At a Glance

Common Takeoff Units of Measure by Trade

Each trade is measured in the units that suppliers and subcontractors actually use to price it.
TradeTypical UnitsExample Items
SiteworkCY, SF, LF, TNExcavation, fill, aggregate base, asphalt, utility pipe
ConcreteCY, SF, LF, LBFootings, slabs, walls, forms, rebar, post-tension tendons
MasonrySF, EA, LFCMU block, brick, grout, bond beams, reinforcing
SteelTN, LF, SFBeams, columns, joists, metal deck, misc. metals
FramingLF, BF, EA, SFStuds, plates, headers, trusses, sheathing
Drywall and stuccoSF, LFGypsum board, metal studs, lath, foam trim, finish coats
RoofingSQ, LFTile, shingle, TPO, foam, underlayment, flashing
FinishesSF, SY, GAL, EATile, carpet, LVP, paint, doors, hardware
PlumbingLF, EAPipe by size and material, fittings, fixtures, valves
HVACLB, LF, EA, TONDuctwork, diffusers, units by tonnage, piping
ElectricalLF, EAConduit, wire by gauge, devices, fixtures, panels

Abbreviations: CY cubic yards, SF square feet, LF linear feet, TN tons, LB pounds, EA each, BF board feet, SQ roofing squares (100 SF), SY square yards, GAL gallons.

Expert Guide

Takeoff vs. Estimate: What Is the Difference?

The terms are often used together, but they are different steps:

  • A takeoff answers “how much?” It is a list of measured quantities, such as 12,400 square feet of 5/8-inch gypsum board or 86 cubic yards of footing concrete.
  • An estimate answers “how much will it cost?” It adds material prices, labor hours, equipment, indirect costs and markups to the takeoff.

Some clients only need the takeoff because they have their own pricing, supplier relationships and labor rates. Others need the full estimate. We offer both, and you can upgrade a takeoff to a priced estimate at any time.

Common takeoff mistakes we prevent

  • Measuring at the wrong scale after a PDF was resized or printed to a different sheet size
  • Missing items shown only in details, sections or schedules rather than on plan views
  • Double-counting areas that appear on both enlarged and overall plans
  • Ignoring wall heights, so areas are calculated from plan length alone
  • Overlooking alternates, add-ons and owner-furnished items
  • Applying waste factors inconsistently across similar materials

Arizona Factors

Arizona Building Details We Take Off Carefully

Arizona construction uses systems and details that are easy to undercount if the estimator is not familiar with them.

Stucco Systems

Three-coat and one-coat stucco measured by wall area with lath, weep screed, control joints, corner aids and foam trim counted separately.

CMU Site and Privacy Walls

Block walls measured by course height and length with footing, grout fill, reinforcing and cap block included.

Post-Tension Slabs

Tendon lengths, anchors, edge forms, slab area and thickened edges taken off from the post-tension shop layout or structural plans.

Concrete Tile Roofs

Roof area in squares with ridge, hip and rake tile, bird stops, underlayment layers and flashings measured by length.

Desert Landscaping

Decomposed granite, boulders, drip irrigation, planting counts and hardscape areas from landscape plans.

Shade and Solar Structures

Carport canopies, ramadas and shade structures with footings, steel and decking measured for each structure.

How It Works

How Our Construction Takeoff Process Works

Every project follows the same transparent four-step process. Read the full walkthrough on our How It Works page or see how we build and check numbers on our Estimating Methodology page.

01

Send Your Documents

Email drawings, specifications, addenda and the bid date, or share a download link for large sets.

02

Approve a Fixed Quote

We confirm scope, fee and delivery date in writing, usually the same business day.

03

Takeoff and Pricing

Quantities are measured digitally and priced with current Arizona labor, material and equipment costs.

04

Review and Delivery

A second estimator checks the work before you receive Excel and PDF files with marked-up drawings.

FAQs

Construction Takeoff Services FAQs

A construction takeoff is a list of measured quantities from the drawings, such as areas, lengths, volumes and counts, organized by trade. Contractors use it to price materials and labor and to order supplies.

We work from PDF, DWG, DXF, TIFF and image files, and we can extract quantities from Revit and IFC models. For best results, send vector PDFs with readable scales.

Single-trade takeoffs for homes and small commercial projects are usually delivered within 24 hours. Multi-trade takeoffs for larger buildings typically take 2 to 5 business days.

Yes. Waste factors can be applied to quantities or listed separately so you can use your own. Tell us your preference when you request a quote.

Yes. Every takeoff includes color-coded marked-up PDF drawings so you can verify exactly what was measured and counted.

Yes. Any takeoff can be upgraded to a priced estimate through our Construction Cost Estimating Services without re-measuring.

Yes. We update the affected quantities and highlight what changed, usually within 24 hours of receiving the addendum.

Get Accurate Construction Takeoff Services in Arizona

Send your plans today for a fixed quote and a firm delivery date. Every estimate is priced with current Arizona labor, material and equipment costs and checked by a second estimator.

Location & Contact

Our Phoenix Office Serves Contractors Across Arizona

Arizona Cost Estimating works from Midtown Phoenix and supports builders, contractors and owners statewide. Send plans by email, call our estimating desk, or use the map below for directions to the office.

Office Address

413 W Osborn Rd, Phoenix, AZ 85013
Midtown Phoenix, Maricopa County

Estimating Desk Hours

Monday to Friday, 8:00 AM to 6:00 PM Arizona Time (MST, no daylight saving)

Scroll to Top