Methodology

Our Construction Estimating Methodology

How we build, price and check every estimate. A transparent look at our standards, data sources, quality controls and documentation, so you know exactly how your numbers were developed.

Overview

Transparent Methods, Defensible Numbers

Quick answer: Arizona Cost Estimating builds every estimate with a documented method: review the documents, measure quantities digitally, price them with current Arizona data, add indirect costs and markups transparently, classify the estimate by design maturity, document every assumption and have a second estimator review the result before delivery.

We publish our methodology because trust in an estimate comes from understanding how it was made. Owners, lenders and contractors should be able to see where each number came from and how reliable it is.

This page also explains how we write and maintain the information on our website, so readers can judge the reliability of our guides and service pages.

Our Standards

Get a Fixed Quote Today

Questions about how we estimate? Ask an estimator.

Method

Step 1: Document Review and Scope Definition

Every estimate starts by reading the full document set: drawings, specifications, addenda, schedules, reports and bid instructions. We identify the scope to be priced, the estimate type requested and the information that is missing or conflicting. Questions are listed and sent to the client before measuring begins, and unresolved items become written assumptions.

Method

Step 2: Quantity Takeoff

Quantities are measured with digital takeoff software after verifying each sheet’s scale against known dimensions. Every item type is assigned a layer and color on the drawings, and quantities are organized by CSI division, trade and, when useful, by building, floor or phase. Takeoffs are cross-checked between disciplines and against schedules. See Construction Takeoff Services.

Method

Step 3: Pricing

Quantities are priced with:

  • Material costs from Arizona suppliers and distributors, refreshed regularly and dated in every estimate
  • Labor costs using local wage levels and productivity rates by trade, adjusted for conditions such as height, access and summer heat; Davis-Bacon rates where required
  • Equipment costs using rental rates and durations appropriate to the work
  • Published cost data adjusted with location factors for Arizona cities, used to check and supplement local pricing
  • Benchmarks from comparable projects by type, size and quality

Method

Step 4: Indirect Costs, Markups and Risk

General conditions are calculated from the expected schedule. Taxes, permits, fees, bonds and insurance are added based on project location and contract type. Overhead and profit are shown separately so they can be adjusted. Contingency reflects design maturity and identified risks, and escalation is added when construction will start or continue well after the pricing date.

Step 5: Classification

Estimate Classes and Expected Accuracy

Every estimate states its class based on AACE International Recommended Practice 18R-97, so readers know how much the actual cost may vary.
ClassDesign MaturityPurposeTypical Accuracy Range
Class 50% to 2%Concept screening-20% to -50% / +30% to +100%
Class 41% to 15%Feasibility-15% to -30% / +20% to +50%
Class 310% to 40%Budget authorization-10% to -20% / +10% to +30%
Class 230% to 75%Control or bid-5% to -15% / +5% to +20%
Class 165% to 100%Check estimate or bid-3% to -10% / +3% to +15%

Step 6: Independent Review

Our Quality Review Checklist

A second estimator who did not prepare the estimate reviews it against this checklist before delivery.
Review AreaWhat Is Checked
Scope coverageEvery specified item has a quantity and price or is listed as excluded
QuantitiesSpot checks against drawings, schedules and benchmarks
Unit costsCompared with current pricing and comparable projects
Math and formulasTotals, extensions and links verified in the workbook
Indirect costsGeneral conditions match schedule; markups match instructions
DocumentationAssumptions, exclusions, pricing date and class written down

Editorial Standards

How We Create and Maintain Website Content

The guides and service pages on this website are written and reviewed by our estimating team. We aim to explain construction cost topics accurately and in plain language for Arizona readers. Our editorial standards are:

  • Experience-based: content reflects how our estimators actually prepare estimates.
  • Accurate references: standards and regulations are described in general terms, and readers are directed to official sources or professionals for final decisions.
  • No guarantees: cost information is educational and is not a substitute for a project-specific estimate.
  • Regular review: pages are reviewed and updated when pricing conditions, regulations or our services change.
  • Corrections: if you find an error, email ask@arizonacostestimating.com and we will review it promptly.

See also our Disclaimer and About Us pages.

FAQs

Methodology FAQs

We organize estimates by CSI MasterFormat, classify them using AACE International’s estimate classification system, and follow consistent takeoff, pricing and review procedures.

Material pricing is refreshed regularly from Arizona suppliers, and every estimate shows its pricing date.

We list questions before measuring, and any unresolved items become written assumptions or allowances.

Yes, when appropriate. Contingency reflects design maturity and identified risks and is shown as a separate line.

Ready for an Accurate Arizona Construction Estimate?

Send your plans today and receive a fixed quote, a clear scope and a delivery date, usually within a few business hours. Every estimate is priced for Arizona labor, materials and site conditions.

Location & Contact

Our Phoenix Office Serves Contractors Across Arizona

Arizona Cost Estimating works from Midtown Phoenix and supports builders, contractors and owners statewide. Send plans by email, call our estimating desk, or use the map below for directions to the office.

Office Address

413 W Osborn Rd, Phoenix, AZ 85013
Midtown Phoenix, Maricopa County

Estimating Desk Hours

Monday to Friday, 8:00 AM to 6:00 PM Arizona Time (MST, no daylight saving)

Scroll to Top